Monday, October 28, 2013

Walkthrough - kitchen

Kitchen cabinets have gone in.

Walkthrough - alfresco, porch tiling

We have had to change our selections for the alfresco and porch since the tiles were discontinued. 

Alfresco tiles

Walkthrough - cornices and wet area tiling

We went in for a walk through to have a look at the work completed so far.
The cornices have been installed. The tiling looks great. I am very happy with our selections so far.
Here are pics of our tiles:

Ensuite

Ensuite Tiles and shower niche   

Shared Bathroom - Tiles and shower niche 

 Cabinets - shared bathroom.
Yes, i see broken tiles ;) it will be fixed. The cabinets were supposed to go in first and then the tilings, but the kitchen guys delayed it and hence the mess
 
 

Powder Room with shower - they forgot to install the feature tiles in shower niche. I notified Tile Direct and they will fix it. 

 

Friday, October 25, 2013

Garage door

The contemporary garage door is in. We opted for the same colorbond color of the weatherboards. I think its looks really good. Can't wait for the Charcoal driveway so that it will all look perfect.

Sunday, October 20, 2013

Lockup, Stairs complete, Rainwater tank installed

The doors have been installed. Eventhough we didn't get the door we ordered,  still okay with the alternate one. It will atleast match the stairs with timber and steel looks ;). The staircase looks complete except for staining.

I've been advised that kitchen is delayed by a week. Hopefully it will all be installed this week.

Sunday, October 13, 2013

Lower bricks cleaned, Staircase installed & Temporary lockup

We had the staircase installed this week. Few doors have been installed.
More pics of the house.

Lower bricks cleaned

Staircase installed 
Master Bedroom - We moved it to the front of the house. I didnt expect the windows to be this big. Happy with it.
Upstairs Lounge - Our TV niche 
 

Monday, October 7, 2013

Electricals, Insulation

Last week we had the electrical rough ins.
The timber feature went in and the insulations works were started. Gyprock is delivered on site and they should be on it this week.
Lockout for Friday. . Yeah.. getting closer and closer. ..