Sunday, October 20, 2013

Lockup, Stairs complete, Rainwater tank installed

The doors have been installed. Eventhough we didn't get the door we ordered,  still okay with the alternate one. It will atleast match the stairs with timber and steel looks ;). The staircase looks complete except for staining.

I've been advised that kitchen is delayed by a week. Hopefully it will all be installed this week.

No comments:

Post a Comment