Monday, October 28, 2013
Walkthrough - alfresco, porch tiling
We have had to change our selections for the alfresco and porch since the tiles were discontinued.
Alfresco tiles
Walkthrough - cornices and wet area tiling
We went in for a walk through to have a look at the work completed so far.
The cornices have been installed. The tiling looks great. I am very happy with our selections so far.
Here are pics of our tiles:
Ensuite
Ensuite Tiles and shower niche
Shared Bathroom - Tiles and shower niche
Cabinets - shared bathroom.
Yes, i see broken tiles ;) it will be fixed. The cabinets were supposed to go in first and then the tilings, but the kitchen guys delayed it and hence the mess Friday, October 25, 2013
Garage door
The contemporary garage door is in. We opted for the same colorbond color of the weatherboards. I think its looks really good. Can't wait for the Charcoal driveway so that it will all look perfect.
Sunday, October 20, 2013
Lockup, Stairs complete, Rainwater tank installed
The doors have been installed. Eventhough we didn't get the door we ordered, still okay with the alternate one. It will atleast match the stairs with timber and steel looks ;). The staircase looks complete except for staining.
I've been advised that kitchen is delayed by a week. Hopefully it will all be installed this week.
Sunday, October 13, 2013
Wednesday, October 9, 2013
Monday, October 7, 2013
Electricals, Insulation
Last week we had the electrical rough ins.
The timber feature went in and the insulations works were started. Gyprock is delivered on site and they should be on it this week.
Lockout for Friday. . Yeah.. getting closer and closer. ..
Subscribe to: